| 10/08/2026 | VIP STEEL | VIP Steel | PO-2411 | INV-8341 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Rolly | 7am-7:30am toolbox and gear check at Harman. 7:30am-4pm spraying intumescent 1001 to perimeter columns ground floor | 07:00 | 16:00 | 9.0 | Approved | 56.25 | — | $506.25 |
| 10/08/2026 | VIP STEEL | VIP Steel | PO-2412 | INV-8342 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Nomel | Masking and prep to perimeter columns, mixing IC1001 and keeping spray rig fed all day | 07:00 | 16:00 | 9.0 | Approved | 50.00 | — | $450.00 |
| 10/08/2026 | VIPPC | VIPPC | B-1123 | INV-8343 | 87 Harman Street | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Mack | 7am-7:30am At Harman Pick up water blaster machine and hoses and loading it to Van. 7:30am-2:30pm travel to 13 Mania then set up the blaster and assisting Mack across the area pulling hoses | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 10/08/2026 | VIPPC | VIPPC | B-1124 | INV-8344 | Toolbox Meeting - Harman Street | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Meeting | Tommy | Toolbox talk — working at height, harness inspection and silica dust controls | 07:00 | 07:30 | 0.5 | Approved | 40.00 | — | $20.00 |
| 10/08/2026 | VIPPC | VIPPC | B-1125 | INV-8345 | Toolbox Meeting - Harman Street | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Meeting | Sam | Toolbox talk attendance and sign-on sheet | 07:00 | 07:30 | 0.5 | Approved | 41.25 | — | $20.63 |
| 10/08/2026 | VIPPC | VIPPC | B-1126 | INV-8346 | Hamilton Jet | Pending | Internal - Rate Charge | VIPPC Internal | VIP Coatings | NCR - VIPPC | Sam | Weld repair prep and coating touch up to fabricated frames in shop bay 2 | 07:30 | 16:00 | 8.5 | Need Check | 41.25 | — | $350.63 |
| 10/08/2026 | TBC - NEEDS SORTING | VIPPC | B-1127 | INV-8347 | Project Ark - Weld repairs | Pending | Internal - Rate Charge | TBC - NEEDS SORTING | VIP Coatings | NCR - VIPPC | Aicher | Weld repair support, scope split between Ark and Hamilton Jet not confirmed on site | 07:00 | 16:00 | 9.0 | Need Check | 44.38 | — | $399.42 |
| 10/08/2026 | VIPPC | VIPPC | B-1128 | INV-8348 | Specx - Topcoat Levels 1-5 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Jayden | Topcoat levels 1-3 complete, rolled and cut in to exposed steel, hoist access from 9am | 07:00 | 15:30 | 8.5 | Approved | 45.00 | — | $382.50 |
| 10/08/2026 | VIPPC | VIPPC | B-1129 | INV-8349 | Specx - Topcoat Levels 1-5 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Leith | Level 4 set up, drop sheets and access hoarding, materials take-off for level 5 | 07:30 | 15:30 | 8.0 | Approved | 50.00 | — | $400.00 |
| 10/08/2026 | VIPPC | VIPPC | B-1130 | INV-8350 | Management | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Donna | Payroll run, subcontractor claims and supplier invoice coding | 08:00 | 16:30 | 8.0 | Approved | 46.25 | — | $370.00 |
| 10/08/2026 | VIP STEEL | VIP Steel | PO-2421 | INV-8351 | 70 High Street - The Cornershop | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Jonathan | Topcoat to structural steel level 2, cutting in around services and brackets | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 10/08/2026 | VIPPC | VIPPC | B-1132 | INV-8352 | Rolleston College | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Andy | Maintenance repaint to gym exterior steel, two coats to handrails and posts | 07:00 | 15:00 | 8.0 | Approved | 40.00 | — | $320.00 |
| 11/08/2026 | VIPPC | VIPPC | B-1133 | INV-8353 | 263 Studholme Road Wanaka | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Hitoshi | Exterior steelwork painting, hard frost delayed start of spraying until 9am, finished east elevation | 07:00 | 17:00 | 10.0 | Approved | 45.00 | 80.00 | $530.00 |
| 11/08/2026 | VIPPC | VIPPC | B-1134 | INV-8354 | 263 Studholme Road Wanaka | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Zakir | Exterior steelwork painting Wanaka, spray support and masking of glazing | 07:00 | 17:00 | 10.0 | Approved | 41.25 | 80.00 | $492.50 |
| 11/08/2026 | VIPPC | VIPPC | B-1135 | INV-8355 | Burnham RSF Camp Rolleston | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Site Painting | Andy | Site painting accommodation block B, doors and frames, second coat to corridor | 07:00 | 15:00 | 8.0 | Approved | 40.00 | — | $320.00 |
| 11/08/2026 | VIPPC | VIPPC | B-1136 | INV-8356 | Burnham RSF Camp Rolleston | Not Invoiced | No Charge | VIPPC Internal | VIPPC | Site Painting | Sean | Rain standdown 10am-11am, moved to internal doors for remainder of shift | 07:00 | 15:00 | 8.0 | Need Check | 37.50 | — | $300.00 |
| 11/08/2026 | VIP STEEL | VIP Steel | PO-2427 | INV-8357 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Rolly | Intumescent to level 1 beams, DFT checks and recording for QA pack | 07:00 | 16:30 | 9.5 | Approved | 56.25 | — | $534.38 |
| 11/08/2026 | VIP STEEL | VIP Steel | PO-2428 | INV-8358 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Nomel | Spraying intumescent level 1, hose runs and pot man duties | 07:00 | 16:00 | 9.0 | Approved | 50.00 | — | $450.00 |
| 11/08/2026 | VIPPC | VIPPC | B-1139 | INV-8359 | Casino - Topcoat 635 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Jonathan | Topcoat 635 to soffit steel, second coat east elevation from scissor lift | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 11/08/2026 | VIPPC | VIPPC | B-1140 | INV-8360 | Casino - Grout | Ready to Claim | VO - Dayworks | VIPPC Project Direct | VIPPC | Grout & Sealant | Jayden | Grout and sealant to base plates, extra works instructed by site foreman | 07:00 | 15:30 | 8.5 | Approved | 45.00 | — | $382.50 |
| 11/08/2026 | VIPPC | VIPPC | B-1141 | INV-8361 | Accounts | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Donna | Accounts processing, GST reconciliation and job costing updates | 08:00 | 16:00 | 7.5 | Approved | 46.25 | — | $346.88 |
| 11/08/2026 | VIPPC | VIPPC | B-1142 | INV-8362 | 13 Mania Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Mack | Water blasting to existing coatings, hose management and waste containment | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 11/08/2026 | VIPPC | VIPPC | B-1143 | INV-8363 | 13 Mania Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Tommy | Assisting with blasting across the area pulling hoses and moving barriers | 07:00 | 15:30 | 8.5 | Approved | 40.00 | — | $340.00 |
| 11/08/2026 | VIP STEEL | VIP Steel | PO-2434 | INV-8364 | 70 High Street - The Cornershop | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Sam | Topcoat structural steel level 3, touch up after scaffold strike | 07:30 | 16:00 | 8.5 | Approved | 41.25 | — | $350.63 |
| 11/08/2026 | VIPPC | VIPPC | B-1145 | INV-8365 | Forte health | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Leith | Client walk with facilities manager, defect list captured and priced | 09:00 | 13:00 | 4.0 | Approved | 50.00 | — | $200.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1146 | INV-8366 | Waipapa Tower 3 - Contract Close out | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Efren | Punch list touch ups levels 8 to 11, protection removal and handover photos | 06:30 | 16:00 | 9.5 | Approved | 50.00 | — | $475.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1147 | INV-8367 | Waipapa Tower 3 - Contract Close out | Pending | VO - Dayworks | VIPPC Project Direct | VIPPC | Topcoating | Aicher | Extra touch ups to lift lobby instructed by main contractor, outside base scope | 07:00 | 16:00 | 9.0 | Need Check | 44.38 | — | $399.42 |
| 12/08/2026 | TBC - NEEDS SORTING | VIPPC | B-1148 | INV-8368 | Waipapa Tower 3 - Contract Close out | Pending | VO - Dayworks | TBC - NEEDS SORTING | VIPPC | Topcoating | Zakir | Assisting with lobby touch ups and protection strip, allocation to be confirmed | 07:00 | 14:00 | 7.0 | Need Check | 41.25 | — | $288.75 |
| 12/08/2026 | VIP STEEL | VIP Steel | PO-2439 | INV-8369 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Rolly | Spraying intumescent to perimeter outside ground floor, removing covering to stair beams | 08:00 | 16:30 | 8.5 | Approved | 56.25 | — | $478.13 |
| 12/08/2026 | VIP STEEL | VIP Steel | PO-2440 | INV-8370 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Hitoshi | Beam covering removal levels 1 and 2, site clean down and gear load out | 08:00 | 16:30 | 8.5 | Approved | 45.00 | — | $382.50 |
| 12/08/2026 | VIPPC | VIPPC | B-1151 | INV-8371 | Casino - Topcoat 635 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Jonathan | Topcoat 635 to remaining soffit bays, DFT readings recorded | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 12/08/2026 | VIPPC | VIPPC | B-1152 | INV-8372 | Casino - Grout | Ready to Claim | VO - Dayworks | VIPPC Project Direct | VIPPC | Grout & Sealant | Jayden | Grouting base plates grid lines 4 to 9, made good after column setting | 07:00 | 15:30 | 8.5 | Approved | 45.00 | — | $382.50 |
| 12/08/2026 | VIPPC | VIPPC | B-1153 | INV-8373 | Chequers Green | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Site Painting | Andy | Exterior steel painting to carport frames and balustrades, two coats | 07:00 | 15:00 | 8.0 | Approved | 40.00 | — | $320.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1154 | INV-8374 | Chequers Green | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Site Painting | Sean | Prep and sand back existing coatings, spot prime rust breakthrough | 07:00 | 15:00 | 8.0 | Approved | 37.50 | — | $300.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1155 | INV-8375 | Parkridge Queenstown | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Zakir | Queenstown site painting exterior steel, overnight stay for two night duration | 07:00 | 17:00 | 10.0 | Approved | 41.25 | 80.00 | $492.50 |
| 12/08/2026 | VIPPC | VIPPC | B-1156 | INV-8376 | Management | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Leith | Programme review with project managers, resourcing for next fortnight | 08:00 | 12:00 | 4.0 | Approved | 68.75 | — | $275.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1157 | INV-8377 | Accounts | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Donna | Supplier invoice coding and Waipapa subcontractor claim preparation | 08:00 | 16:30 | 8.0 | Approved | 46.25 | — | $370.00 |
| 12/08/2026 | VIP STEEL | VIP Steel | PO-2448 | INV-8378 | 70 High Street - The Cornershop | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Nomel | Topcoat structural steel levels 2 and 3, rain stopped external work at 2pm | 07:00 | 16:00 | 9.0 | Approved | 50.00 | — | $450.00 |
| 12/08/2026 | VIPPC | VIPPC | B-1159 | INV-8379 | McKay Motorcycles | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Mack | Showroom steel repaint, cutting in around glazing and signage brackets | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 13/08/2026 | VIPPC | VIPPC | B-1160 | INV-8380 | Waipapa Tower 3 - Contract Close out | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Efren | Close out punch list levels 5 to 7, QA photos and sign off with client rep | 06:30 | 15:30 | 8.5 | Approved | 50.00 | — | $425.00 |
| 13/08/2026 | VIPPC | VIPPC | B-1161 | INV-8381 | Waipapa Tower 3 - Contract Close out | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Overhead | Leith | Waipapa Tower 3 close out documentation, QA pack compilation for handover | 08:30 | 15:30 | 7.0 | Approved | 68.75 | — | $481.25 |
| 13/08/2026 | VIP STEEL | VIP Steel | PO-2452 | INV-8382 | 70 High Street - The Cornershop | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Nomel | Topcoat structural steel, touch up two beams after scaffold strike | 07:00 | 16:00 | 9.0 | Approved | 50.00 | — | $450.00 |
| 13/08/2026 | VIP STEEL | VIP Steel | PO-2453 | INV-8383 | 70 High Street - The Cornershop | Pending | VO - Dayworks | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Mack | Internal prep after rain stop, additional make good to columns not in scope | 07:00 | 15:30 | 8.5 | Need Check | 47.50 | — | $403.75 |
| 13/08/2026 | VIP STEEL | VIP Steel | PO-2454 | INV-8384 | 70 High Street - The Cornershop | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Topcoating | Sam | Assisting topcoat crew, materials runs and equipment set up | 07:30 | 16:00 | 8.5 | Approved | 41.25 | — | $350.63 |
| 13/08/2026 | VIPPC | VIPPC | B-1165 | INV-8385 | Accounts | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Donna | Accounts processing and claim prep for Waipapa Tower 3 close out | 08:00 | 13:00 | 5.0 | Approved | 46.25 | — | $231.25 |
| 13/08/2026 | VIPPC | VIPPC | B-1166 | INV-8386 | Weekly Meeting | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Meeting | Donna | Weekly management meeting minutes, actions circulated and H&S filing | 13:00 | 16:00 | 3.0 | Approved | 46.25 | — | $138.75 |
| 13/08/2026 | VIPPC | VIPPC | B-1167 | INV-8387 | Weekly Meeting | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Meeting | Andy | Weekly production meeting, job programme and labour allocation | 13:00 | 14:00 | 1.0 | Approved | 40.00 | — | $40.00 |
| 13/08/2026 | VIPPC | VIPPC | B-1168 | INV-8388 | Weekly Meeting | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Meeting | Jonathan | Weekly production meeting attendance | 13:00 | 14:00 | 1.0 | Approved | 47.50 | — | $47.50 |
| 13/08/2026 | VIPPC | VIPPC | B-1169 | INV-8389 | 44 Kitcheners Knoll Road | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Site Painting | Sean | Exterior steel and balustrade coating, access via scaffold north side | 07:00 | 15:00 | 8.0 | Approved | 37.50 | — | $300.00 |
| 13/08/2026 | VIPPC | VIPPC | B-1100 | INV-8390 | 81 Buchanans Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Tommy | Yard blasting and priming of fabricated brackets for Buchanans Rd delivery | 07:00 | 15:30 | 8.5 | Approved | 40.00 | — | $340.00 |
| 13/08/2026 | VIPPC | VIPPC | B-1101 | INV-8391 | Forte - base build | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Jayden | Base build topcoat to exposed steel level 2, cutting in to fire collars | 07:00 | 15:30 | 8.5 | Approved | 45.00 | — | $382.50 |
| 13/08/2026 | VIPPC | VIPPC | B-1102 | INV-8392 | DHL | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Andy | Warehouse line marking and bollard repaint, works outside operating hours | 15:00 | 20:00 | 5.0 | Approved | 40.00 | — | $200.00 |
| 13/08/2026 | VIPPC | VIPPC | B-1103 | INV-8393 | Parkridge Queenstown | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Zakir | Queenstown exterior steel second coat, overnight allowance applies | 07:00 | 17:00 | 10.0 | Approved | 41.25 | 80.00 | $492.50 |
| 13/08/2026 | VIPPC | VIPPC | B-1104 | INV-8394 | 263 Studholme Road Wanaka | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Hitoshi | Wanaka steelwork completion, punch list and client walk through | 07:00 | 16:00 | 9.0 | Approved | 45.00 | 80.00 | $485.00 |
| 14/08/2026 | VIP STEEL | VIP Steel | PO-2465 | INV-8395 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Rolly | Prep and spray intumescent 1001, perimeter ground floor then covering removal | 08:00 | 16:30 | 8.5 | Approved | 56.25 | — | $478.13 |
| 14/08/2026 | VIP STEEL | VIP Steel | PO-2466 | INV-8396 | Superlot 13 - Intumescent | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP STEEL - Site Painting | Intumescent | Nomel | Spray intumescent perimeter outside ground floor, pot man and hose runs | 07:00 | 16:00 | 9.0 | Approved | 50.00 | — | $450.00 |
| 14/08/2026 | VIP STEEL | VIP Steel | PO-2467 | INV-8397 | Superlot 13 - Intumescent | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIP STEEL - Site Painting | Intumescent | Jonathan | Masking and set up, beam prep ahead of Monday spray programme | 07:30 | 16:00 | 8.5 | Approved | 47.50 | — | $403.75 |
| 14/08/2026 | VIP STEEL | VIP Steel | PO-2468 | INV-8398 | 87 Harman Street | Pending | Internal - Rate Charge | VIPPC Internal | VIP STEEL - Site Painting | Site Painting | Hitoshi | Site clean down and gear load out back to Harman Street yard | 08:00 | 16:30 | 8.5 | Need Check | 45.00 | — | $382.50 |
| 14/08/2026 | VIPPC | VIPPC | B-1109 | INV-8399 | Waipapa Tower 3 - Contract Close out | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Efren | Final close out sweep, remaining protection removed and site handed back | 06:30 | 15:00 | 8.5 | Approved | 50.00 | — | $425.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1110 | INV-8400 | Waipapa Tower 3 - Contract Close out | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Aicher | Handover photos, defect close out register updated with client rep | 07:00 | 15:30 | 8.5 | Approved | 44.38 | — | $377.23 |
| 14/08/2026 | VIPPC | VIPPC | B-1111 | INV-8401 | Casino - Topcoat 635 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Jonathan | Topcoat 635 final bays, DFT verification and touch up of holidays | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 14/08/2026 | VIPPC | VIPPC | B-1112 | INV-8402 | Casino - Grout | Ready to Claim | VO - Dayworks | VIPPC Project Direct | VIPPC | Grout & Sealant | Jayden | Grout and sealant works completed, base plates made good grid 10 to 14 | 07:00 | 14:30 | 7.5 | Approved | 45.00 | — | $337.50 |
| 14/08/2026 | VIPPC | VIPPC | B-1113 | INV-8403 | 7 Sir Tim Wallis Drive | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIP Coatings | Site Painting | Zakir | Hangar steelwork coating, spray application to purlins and portal frames | 07:00 | 16:00 | 9.0 | Approved | 41.25 | 80.00 | $451.25 |
| 14/08/2026 | VIPPC | VIPPC | B-1114 | INV-8404 | Rolleston College | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Andy | Gym exterior steel repaint completed, handrails and posts second coat | 07:00 | 15:00 | 8.0 | Approved | 40.00 | — | $320.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1115 | INV-8405 | Burnham RSF Camp Rolleston | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Site Painting | Sean | Accommodation block B completion, doors frames and corridor final coat | 07:00 | 15:00 | 8.0 | Approved | 37.50 | — | $300.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1116 | INV-8406 | 13 Mania Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Mack | Water blasting completion, equipment wash down and return to yard | 07:00 | 15:30 | 8.5 | Approved | 47.50 | — | $403.75 |
| 14/08/2026 | VIPPC | VIPPC | B-1117 | INV-8407 | 13 Mania Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIPPC | Site Painting | Tommy | Hose management, waste containment and site tidy at 13 Mania Rd | 07:00 | 15:30 | 8.5 | Approved | 40.00 | — | $340.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1118 | INV-8408 | Specx - Topcoat Levels 1-5 | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Leith | Topcoat level 4 and 5 progress, hoist booking coordination with builder | 07:30 | 15:30 | 8.0 | Approved | 50.00 | — | $400.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1119 | INV-8409 | Forte - base build | Ready to Claim | Quoted - Claim | VIPPC Project Direct | VIPPC | Topcoating | Sam | Base build topcoat level 3, cut in around services and bracing | 07:30 | 16:00 | 8.5 | Approved | 41.25 | — | $350.63 |
| 14/08/2026 | VIPPC | VIPPC | B-1120 | INV-8410 | Hamilton Jet | Not Invoiced | No Charge | VIPPC Internal | VIP Coatings | NCR - VIPPC | Sam | Rework of coating defect identified at inspection, non conformance carried internally | 16:00 | 18:00 | 2.0 | Need Check | 41.25 | — | $82.50 |
| 14/08/2026 | VIPPC | VIPPC | B-1121 | INV-8411 | Management | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Leith | Month end review, WIP position and forecast labour for September | 08:00 | 12:00 | 4.0 | Approved | 68.75 | — | $275.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1122 | INV-8412 | Accounts | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Overhead | Donna | Weekly payroll finalisation and timesheet reconciliation | 08:00 | 16:00 | 7.5 | Approved | 46.25 | — | $346.88 |
| 14/08/2026 | TBC - NEEDS SORTING | VIPPC | B-1123 | INV-8413 | Project Ark - Weld repairs | Pending | Internal - Rate Charge | TBC - NEEDS SORTING | VIP Coatings | NCR - VIPPC | Aicher | Weld repair coating touch up, cost centre still to be confirmed with Leith | 07:00 | 15:00 | 8.0 | Need Check | 44.38 | — | $355.04 |
| 14/08/2026 | VIPPC | VIPPC | B-1124 | INV-8414 | McKay Motorcycles | Ready to Claim | Passive - Invoice | VIPPC Project Direct | VIPPC | Site Painting | Jayden | Showroom repaint completion and protection removal | 15:00 | 17:00 | 2.0 | Approved | 45.00 | — | $90.00 |
| 14/08/2026 | VIPPC | VIPPC | B-1125 | INV-8415 | Annual Leave | Not Invoiced | Overhead | VIPPC Internal | VIPPC | Annual Leave | Sean | Annual leave — half day approved | 13:00 | 17:00 | 4.0 | Approved | 37.50 | — | $150.00 |
| 14/08/2026 | VIP STEEL | VIP Steel | PO-2486 | INV-8416 | 81 Buchanans Rd | Ready to Claim | Internal - Rate Charge | VIPPC Internal | VIP STEEL - Site Painting | Site Painting | Tommy | Prime and stack fabricated brackets ready for site delivery Monday | 15:30 | 17:00 | 1.5 | Approved | 40.00 | — | $60.00 |